{"id":420,"date":"2017-01-16T14:00:27","date_gmt":"2017-01-16T14:00:27","guid":{"rendered":"http:\/\/www.gordonforsythbuildingservices.co.uk\/?page_id=420"},"modified":"2017-01-16T14:00:27","modified_gmt":"2017-01-16T14:00:27","slug":"hair-salon","status":"publish","type":"page","link":"https:\/\/gordonforsythbuildingservices.co.uk\/?page_id=420","title":{"rendered":"Hair Salon"},"content":{"rendered":"<p>[et_pb_section][et_pb_row][et_pb_column type=&#8221;1_2&#8243;][\/et_pb_column][et_pb_column type=&#8221;1_2&#8243;][et_pb_text admin_label=&#8221;Text&#8221; background_layout=&#8221;light&#8221; text_orientation=&#8221;left&#8221;]<\/p>\n<p><span style=\"font-family: Arial,serif;\">The brief was to carry out a complete renovation of an existing Hair Salon within a two week period. The Salon was closed for the duration of the works and it was imperative that they opened within this programme as they had Staff returning from leave. <\/span><\/p>\n<p><span style=\"font-family: Arial,serif;\">Works involved a complete strip out, new electrics, plumbing, flooring, heating,<\/span><\/p>\n<p><span style=\"font-family: Arial,serif;\">Fabrication of specialist mirrors and curved laminated reception desk also which were manufactured in our workshops.<\/span><\/p>\n<p><span style=\"font-family: Arial,serif;\">Specialist lighting and painter work was also carried out. The Salon was opened on time which involved 24 hour around the clock working.<\/span><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p><div class=\"et_pb_section et_pb_section_0 et_section_regular\" >\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div><div class=\"et_pb_row et_pb_row_0 et_pb_row_empty\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div> The brief was to carry out a complete renovation of an existing Hair Salon within a two week period. The Salon was closed for the duration of the works and it was imperative that they opened within this programme as they had Staff returning from leave. Works involved a complete strip out, new electrics, [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"class_list":["post-420","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/gordonforsythbuildingservices.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/420","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gordonforsythbuildingservices.co.uk\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/gordonforsythbuildingservices.co.uk\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/gordonforsythbuildingservices.co.uk\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gordonforsythbuildingservices.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=420"}],"version-history":[{"count":1,"href":"https:\/\/gordonforsythbuildingservices.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/420\/revisions"}],"predecessor-version":[{"id":421,"href":"https:\/\/gordonforsythbuildingservices.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/420\/revisions\/421"}],"wp:attachment":[{"href":"https:\/\/gordonforsythbuildingservices.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}